Traffic

Click to Interact
Type
Location
Description
Time
incident
SR-60WB
Construction blocking right turn lane in Courtney Campbell Cswy on Courtney Campbell Cswy (SR-60) WB approaching Rocky Point Drive
incident
SR-60EB
Accident. Right lane blocked in Hillsborough on Brandon Blvd (SR-60) EB at Lithia-Pinecrest Road
incident
SR-60WB
Accident. Three right lanes blocked. in Brandon on Brandon Blvd (SR-60) WB approaching I-75. Reported by 511 DOT
incident
US-192EB
Earlier accident in Kissimmee on US 192 EB between International Dr S and Poinciana Blvd. Reported by FL 511
incident
I-4WB
Accident. Shoulder blocked in Orange on I-4 WB before SR 535 (MM 68). Reported by FL 511
incident
Osceola PkyWB
Accident in Osceola on Osceola Pky WB approaching I-4. Reported by FHP
incident
US-17SB
Accident in Orange on Hwy 17-92 SB at Taft Vineland Rd. Reported by FHP
construction
SR-60WB
Road construction. Right lane closed in Courtney Campbell Cswy on Courtney Campbell Cswy (SR-60) WB before Rocky Point Drive. Reported by 511 DOT Camera
construction
SR-60WB
Road construction. Right lane closed in Tampa on Adamo Drive (SR-60) WB before Channelside Drive. Reported by 511 DOT
construction
US-17Both NB/SB
Long-term road construction in Polk on Hwy 17-92 NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St. Reported by FDOT-District 5
construction
I-4Both EB/WB
Interchange Improvements in Orange on I-4 EB/WB at SR 535 (MM 68). Reported by DOT
construction
I-4WB
Long-term road construction in Hillsborough on I-4 WB to NB & SB I-275. Reported by FDOT Tampa Bay
construction
I-275SB
Off-ramp closed in Pinellas on I-275 SB off-ramp to 54th Ave N (Mm26). Reported by FDOT Tampa Bay
construction
I-275SB
Long-term road construction in Tampa on I-275 SB to EB I-4. Reported by FDOT Tampa Bay
construction
US-192Both EB/WB
Paving operations in Osceola on US 192 EB/WB between SR-535/Vineland Rd and Orange Blossom Trail/Main St/US 17-92. Reported by FDOT-District 5
construction
US-19Both NB/SB
Long-term road construction in Pinellas on US 19 NB/SB between SR-580 and County Road 95. Reported by FDOT Tampa Bay
construction
SR-70Both NB/SB
Construction work in Tampa Bay on 15th Street East NB/SB between 30th Ave E and 26th Ave East. Reported by FDOT | @MyFDOT
construction
SR-31Both NB/SB
Road construction in Lee (FT Myers Shores) on State Road 31 NB/SB between Bayshore Road (SR 78) to Horseshoe Road/Lake Babcock Drive. Reported by swfloridaroads.com
construction
US-41Both NB/SB
Construction work in Bayshore Gardens on US 41 NB/SB between Bayshore Gardens Parkway and 53rd Avenue West. Reported by FDOT | @MyFDOT
construction
SR-70Both EB/WB
Long-term road construction in Lakewood Ranch on State Road 70 EB/WB between Bourneside Rd and CR 675. Reported by FDOT | @MyFDOT
On Air101.5 The Vibe - Tampa Bay’s only R&B Logo

mobile apps

Everything you love about 1015vibe.com and more! Tap on any of the buttons below to download our app.

smart speakers

Ask your smart speaker to play 101.5 The Vibe.